Building permit fees in Ontario for 2026, compared across Toronto, Mississauga, Hamilton, Kitchener and Guelph: minimum fees, per-area rates for basements and additions, and flat fees for decks.

Need building permit services? Compare quotes from independent local contractors.

Get building permit services quotes

Quick answer

Most Ontario building permit fees are a rate times the floor area of the work, with a minimum fee. In 2026 the minimum is $214.79 in Toronto, $244.00 in Mississauga, $291 in Hamilton and $160.00 in Guelph. Finishing a 75 m² basement works out to about $300–$480 in permit fees in these cities. Always confirm the current fee with your municipality.

A building permit in Ontario usually costs a few hundred dollars for a deck, basement or small renovation, and more for an addition or new house. Each municipality sets its own fees, and most charge a rate per square metre or square foot of the work, with a minimum fee. The figures below come from each city's published fee schedule. Fees change, so confirm the current amount with your municipality before you apply.

Building Permit Fees in Ontario (2026)

Toronto (effective January 1, 2026)

Minimum permit fee$214.79Any permit
New house or addition$18.56 per m²Plus $56.33 per new residential unit
Finishing a basement$6.20 per m²Basement finishing in a dwelling
Interior alterations$11.53 per m²Residential floor replacement $13.41 per m²
Deck, porch or carport$214.79 flatResidential
Furnace or HVAC replacement$214.79 flatHVAC with air conditioning $270.64

Serving 30 Ontario cities

Get building permit services quotes

About a minute · No account needed

Add email or job details (optional)

Sent to up to 3 checked, independent contractors in your area. Pro Tasker does not do the work itself.

Mississauga (2026 schedule)

Residential minimum$244.00Houses
New house; residential addition$18.99 per m²; $13.96 per m²Detached, semi, town, duplex
Finishing a basement$5.64 per m²Houses
Additional residential unit$11.33 per m²Plus the minimum residential fee
Deck, porch or basement walkout$244.00 eachHouses

Hamilton, Kitchener and Guelph

Hamilton minimum$291The city page shows no effective year
Hamilton basement finishing$4.06 per m²Also renovating finished areas
Hamilton additional dwelling unit$515 flatDetached rear-yard unit $1,030
Kitchener basement finishing or interior alterations$0.37 per sq ft ($95 minimum)Plus a $250 rebate fee, refunded when the final inspection passes; the page shows no date
Kitchener deck, porch or shed$95 eachFlat
Guelph minimum (low-rise residential)$160.00Effective July 1, 2026
Guelph basement finishing or renovations$0.59 per sq ftAccessory apartment $0.59 per sq ft, $480.00 minimum
Guelph deck, porch, shed or garage$160.00 flatGarage per bay

Example: Permit Fee to Finish a Basement

Calculated from the published rates above for a 75 m² (807 sq ft) basement: Toronto $465.00, Mississauga $423.00, Hamilton $304.50, Kitchener $298.70 plus the $250 refundable rebate fee, and Guelph $476.30. These are our own calculations, not quotes from the cities.

What Affects the Price

  • Floor area of the work, since most fees are a rate times the area
  • Type of work: new floor space costs more per m² than finishing or altering existing space
  • Your municipality and its minimum fee
  • Separate flat fees for decks, HVAC, plumbing fixtures or backwater valves
  • Refundable deposits such as Kitchener's rebate fee
  • Drawings or a designer's fee, which are separate from the permit fee
  • Development charges when you add a new unit

What Requires a Building Permit in Ontario?

A permit is usually needed for structural changes, finishing a basement, most decks more than 24 inches (600 mm) off the ground, new or moved plumbing, new heating equipment, additions and second units. Painting, flooring and like-for-like fixture swaps usually do not need one. Small sheds and low decks are often exempt, but the size limits depend on the Ontario Building Code and local by-laws, so check with your building department before you build.

Electrical work is separate. It goes through an Electrical Safety Authority (ESA) notification, not a building permit, and has its own fee.

How Long Permits Take, and Building Without One

Review times depend on the municipality, the type of project and whether the application is complete, so ask your building department for its current timelines. Building without a required permit can lead to an order to stop work, open up finished walls for inspection or remove the work, and it can cause problems when you sell or make an insurance claim. To get a permit after the fact, apply as normal; the city may ask for drawings and for parts of the work to be exposed so an inspector can see them.

Getting Quotes

Ask contractors whether their price includes applying for the permit, preparing drawings and booking inspections, or whether you are expected to handle them. The fee itself is paid to the city and is the same whoever applies.

Planning a project that needs a permit? Request quotes through Pro Tasker and compare independent local contractors.

Common questions

How much is a building permit in Ontario?

It depends on the city and the size of the work. In 2026 minimum fees are $214.79 in Toronto, $244.00 in Mississauga, $291 in Hamilton and $160.00 in Guelph, and larger projects are charged per m² or sq ft. Confirm the current fee with your municipality.

What are the City of Toronto building permit fees?

Toronto's 2026 schedule has a $214.79 minimum, $18.56 per m² for a new house or addition, $6.20 per m² for finishing a basement, $11.53 per m² for interior alterations and a flat $214.79 for a residential deck or porch.

How much does a basement permit cost?

Finishing a 75 m² basement works out to about $300–$480 in permit fees in Toronto, Mississauga, Hamilton, Kitchener and Guelph, based on their published rates. Kitchener also takes a $250 refundable rebate fee.

How much does a deck permit cost?

Several cities charge a flat fee: $214.79 in Toronto, $244.00 in Mississauga, $95 in Kitchener and $160.00 in Guelph. Hamilton charges $5.36 per m² of deck.

Is an ESA permit the same as a building permit?

No. Electrical work in Ontario is filed with the Electrical Safety Authority through a separate notification with its own fee. A renovation can need both.

Serving 30 Ontario cities

Ready for building permit services quotes?

About a minute · No account needed

Add email or job details (optional)

Sent to up to 3 checked, independent contractors in your area. Pro Tasker does not do the work itself.

Keep reading