Upgrading an Ontario home from a 100-amp to a 200-amp panel typically costs $2,000–$3,500, or $2,500–$4,000 when a new meter base is needed. Expect $2,500–$4,500 in Toronto. The ESA permit and inspection add $200–$350, and a utility reconnection fee is often $300–$600.
An electrical panel upgrade (also called a service upgrade or hydro upgrade) is one of the most impactful home improvements an Ontario homeowner can make. It's required for EV charger installation, high-efficiency heat pumps, electric ranges, and many home addition projects. In 2026, a 100A to 200A upgrade typically costs $2,000–$3,500 in Ontario, or $2,500–$4,000 with a new meter base ($2,500–$4,500 in Toronto), plus $200–$350 for the ESA permit and inspection.
Electrical Panel Upgrade Cost Ontario — by Scenario
| 100A to 200A upgrade (standard) | $2,000 – $3,500 |
|---|---|
| 100A to 200A with new meter base | $2,500 – $4,000 |
| 200A to 400A (large home / EV + heat pump) | $4,500 – $8,000 |
| Panel replacement only (same amperage) | $1,200 – $2,500 |
| ESA permit and inspection fee | $200 – $350 |
| Hydro utility reconnection fee (Toronto Hydro/Hydro One) | $300 – $600 |
Signs You Need a Panel Upgrade
- Breakers trip frequently, especially when running multiple appliances
- You want to install an EV charger (Level 2 requires 40–50A dedicated circuit)
- Your home has a fuse box rather than a circuit breaker panel
- You have a Federal Pacific or Zinsco panel — both are fire hazards and must be replaced
- You're adding a major appliance (induction range, heat pump, hot tub)
- Your insurer requires an upgrade as a condition of coverage
- Your home is pre-1970 with original 60A service — below Ontario's current minimum
The ESA Process: What to Expect
- Your electrician applies for an ESA permit before any work begins
- Electrician contacts your utility (Toronto Hydro, Hydro One, etc.) to schedule a disconnect — utilities disconnect the meter, electrician does the work, utility reconnects
- Work is completed — typically 4–8 hours for the electrician
- ESA inspector visits (scheduled separately, 1–3 week wait in most Ontario cities)
- Inspector signs off, utility reconnects permanently, permit closed
- You receive your ESA Certificate of Inspection — keep this for insurance and resale
Panel Upgrade and Home Insurance in Ontario
Ontario home insurers increasingly require proof of panel condition for new policies and renewals. Knob-and-tube wiring, Federal Pacific panels, and sub-100A services are red flags that can result in coverage denial or significant premium increases. A completed panel upgrade with an ESA Certificate of Inspection is the documentation your insurer needs — and often results in a premium reduction of $100–$300/year.
How to Find a Licensed Electrician for Panel Work
Panel upgrades in Ontario must be performed by a Licensed Electrical Contractor (LEC) — the ESA's designation for electrical businesses authorized to pull permits. Individual electricians hold a Certificate of Qualification (309A Construction and Maintenance, or 309C Domestic and Rural). You can check a contractor's licence on the ESA website at esa.on.ca, and an individual's certificate on the Skilled Trades Ontario public register. Never hire an electrician who says a permit isn't required for panel work — it always is.
200 Amp Panel Upgrade Cost in Toronto & the GTA (2026)
Panel upgrades in Toronto and the surrounding GTA follow the same ESA process as the rest of Ontario, but the utility coordination step adds complexity. Toronto Hydro, which serves the whole City of Toronto including Scarborough, North York and Etobicoke, requires a scheduled disconnect appointment that can take 2–4 weeks to book during peak season (spring and fall). Outside the city, utilities such as Alectra and Hydro One handle the disconnect, and scheduling is faster in some areas. For homes in older Toronto neighbourhoods — the Annex, East York, Leslieville, and Roncesvalles — pre-1970 wiring and knob-and-tube often surface during the panel work, adding $500–$2,500 for rewiring sections that can't legally be connected to a 200A service.
| 100A to 200A upgrade — Toronto (Toronto Hydro area) | $2,500 – $4,500 |
|---|---|
| 100A to 200A upgrade — Scarborough / North York | $2,200 – $4,000 |
| Toronto Hydro disconnect scheduling wait time | 2 – 4 weeks (peak season) |
| Toronto Hydro reconnection fee | $350 – $600 |
| Knob-and-tube remediation add-on (common in pre-1960 Toronto homes) | $500 – $2,500 |
| ESA permit (Toronto) | $200 – $350 |
Common questions
How much does a 200 amp panel upgrade cost in Toronto?
In the Toronto Hydro area, a 100A to 200A upgrade typically costs $2,500–$4,500, and $2,200–$4,000 in Scarborough and North York. Toronto Hydro's reconnection fee runs $350–$600.
Do I need a permit to upgrade my electrical panel in Ontario?
Yes. Panel work always needs an ESA permit, which is pulled by a Licensed Electrical Contractor before the work starts. The ESA permit and inspection typically cost $200–$350.
How long does a panel upgrade take?
The electrical work itself usually takes 4–8 hours. Scheduling the utility disconnect and the ESA inspection can add one to several weeks, and Toronto Hydro disconnects can take 2–4 weeks in peak season.
How much does a 400 amp upgrade cost?
Moving from 200A to 400A, usually for large homes adding an EV charger and heat pump, typically costs $4,500–$8,000.
What are the signs I need a panel upgrade?
Frequent tripped breakers, a fuse box instead of breakers, a Federal Pacific or Zinsco panel, or plans to add an EV charger, heat pump or other large load are common reasons to upgrade.
Prices in your city