Get a quoteGetting multiple renovation quotes is standard advice — but most homeowners don't know how to ask for quotes correctly or compare them fairly. A low quote often wins the job, but costs far more in the end. Here's how to do it right in Ontario.
How Many Quotes Should You Get?
What to Give Each Contractor Before They Quote
- A written scope of work — describe what you want done in as much detail as possible
- Photos or a site walkthrough — the more they understand, the more accurate the quote
- Your budget range — contractors who work with honest clients give better quotes
- Your timeline requirements — rush jobs cost more
- Any existing plans or drawings (especially for larger renovations)
- A list of specific materials if you have preferences (tile, fixtures, cabinets)
What a Good Renovation Quote Should Include
- Itemized labour and materials — not a single lump sum
- Brand and model of specified materials (not just "tile" — which tile?)
- Permit costs (if applicable) — some contractors exclude these
- HST (13% in Ontario) — confirm whether it's included or extra
- Payment schedule tied to milestones
- Estimated start and completion dates
- Warranty on workmanship
- Allowances for unknown conditions (e.g., "plumbing allowance: $500 if relocation needed")
How to Compare Quotes Fairly
- Make sure all quotes cover the same scope — apples to apples, not apples to oranges
- Add HST to any quote that excludes it before comparing
- Ask why there's a large price gap — legitimate reasons exist (material quality, experience)
- Check what's NOT included — a low quote often excludes permits, disposal, or finishing
- Verify each contractor's insurance and WSIB status before the price matters
- Look at reviews — a $2,000 premium for a highly-reviewed contractor is usually worth it
Red Flags in a Renovation Quote
- No itemization — just a total number with no breakdown
- No HST mentioned — every registered business must charge HST
- Quote delivered verbally only — always get it in writing
- "Price is only good for 24 hours" — a pressure tactic, not a legitimate constraint
- Lowest quote by 40%+ — either they've missed something or they're cutting corners
- No permit costs listed for a project that clearly needs permits