Get kitchen renovation quotesThe kitchen is the most renovated room in Canadian homes — and the one where budgets most often spiral. This guide breaks kitchen renovations into three tiers with real Ontario pricing so you can plan accurately before you start.
Kitchen Renovation Cost by Tier
Tier 1: Cosmetic Refresh ($15,000 – $30,000)
- Cabinet refacing or repainting (keep existing layout)
- New countertops (laminate or entry-level quartz)
- New backsplash tile
- Appliance upgrade (mid-range package)
- Fixture and hardware replacement
- New flooring (LVP or ceramic)
Tier 2: Mid-Range Renovation ($30,000 – $60,000)
- New semi-custom or stock cabinets
- Quartz or granite countertops
- Hardwood or premium LVP flooring
- New plumbing fixtures and possible drain relocation
- Updated electrical (new circuits for island, hood fan)
- Premium appliances
- New windows or lighting
Tier 3: Full Gut Renovation ($60,000 – $120,000+)
- Complete layout change — walls moved, island added
- Custom cabinetry
- Premium stone countertops
- Full electrical and plumbing relocation
- Professional-grade appliances
- High-end finishes throughout
- Structural changes if opening to living area
Cost Breakdown by Trade
| Cabinets (mid-range, 10 linear ft) | $4,000 – $12,000 |
|---|---|
| Countertops (quartz, 30 sqft) | $2,500 – $6,000 |
| Flooring (200 sqft LVP installed) | $2,000 – $4,500 |
| Backsplash tile (installed) | $800 – $2,500 |
| Plumbing (sink, dishwasher, relocation) | $1,500 – $5,000 |
| Electrical (outlets, circuits, lighting) | $1,500 – $4,000 |
| Appliances (mid-range package) | $4,000 – $10,000 |
| Labour (design + general contracting) | $8,000 – $20,000 |
How long does a kitchen renovation take in Ontario?
A kitchen renovation in Ontario takes 3–10 weeks from demolition to final walkthrough, depending on scope. A cosmetic refresh (painting cabinets, new countertops, new hardware) takes 1–3 weeks. A mid-range reno with new cabinets, tile backsplash, and appliance relocation typically takes 4–6 weeks. A full gut renovation — moving walls, new electrical, new plumbing — runs 8–12 weeks or more. Lead times for custom cabinets (6–12 weeks from order) are usually the longest single delay. Plan your renovation around cabinet delivery, not the other way around.